Pax Silica in New Clark City, Capas, Tarlac

Pax Silica needs 3,000 MW and 65 to 90 million liters of water daily

The Bases Conversion and Development Authority announced both full-development figures in July 2026. Construction starts in 2028, with full development 10 to 15 years later.

The charts compare those figures with public market, grid, water, and land records. They label every calculation and assumption.

Pax Silica's 3,000 MW exceeds the highest recorded Visayas demand

The comparison uses 117 archived days. Luzon peaked at 14,232 MW. Visayas peaked at 2,744 MW and Mindanao at 2,748 MW.

Announced Pax Silica demand compared with recorded island-grid demand
Pax Silica would use more power than the entire Visayas grid
Block area shows megawatts (MW). Pax Silica is announced future demand. The island blocks show recorded five-minute demand. Island populations, 2020 census, give a second size reference.

Visayas forecasts around the same period ranged from 2,384 to 2,482 MW against 2,581 to 2,587 MW available. These are day-ahead values.

The market operator supplies the grid records. The Bases Conversion and Development Authority supplies the 3,000 MW figure.

Sources. Market records · BCDA figure

A 500 MW solar component produces 4.1% of one Pax Silica day in the cloudless-day model

ACWA Power leased 500 hectares for a project announced as solar plus battery storage. The chart models only the stated 500 MW solar component because no battery power or energy rating was published.

A signed New Clark City solar project compared with flat demand
The modeled 500 MW solar component produces 4.1% of Pax Silica's daily electricity on a cloudless day
The line holds Pax Silica at 3,000 megawatts (MW). The filled area shows output from 500 MW of solar on a cloudless day.

The lease is a public announcement. The hourly solar shape is a project assumption.

Sources. ACWA lease · Pax Silica demand

Solar alone would need 12,200 MW of panels. At the stated land density, that equals 122 square kilometers.

A solar-only area shown at map scale
Running Pax Silica on solar power alone would need 122 km² of panels
The map draws the calculated area over Metro Manila for scale. Pax Silica is about 95 km north. Clouds would increase the area.

The calculation uses MTerra Solar's stated megawatt and hectare figures. OpenStreetMap contributors and CARTO supply the basemap.

Sources. MTerra Solar figures · Map data

Public route geometry does not establish how much Pax Silica can connect

The illustration below applies an assumed 400 MW class rating to each mapped 230 kV circuit and subtracts modeled flow for one hour. NGCP does not publish the circuit ratings needed to turn this into an interconnection result.

Class-rating illustration near New Clark City
An assumed circuit rating produces 769 MW of modeled headroom, not a site connection limit
Each row shows one 230 kilovolt (kV) route with two circuits. The model assigns 400 megawatts (400 MW) to each circuit because NGCP publishes no rating for these circuits. The diagram cannot establish available service for Pax Silica.

The National Grid Corporation of the Philippines (NGCP) supplies project records. OpenStreetMap supplies route geometry.

Sources. Demand record · Route map

Recent long-distance grid projects
NGCP's two most recent long-distance builds took 13 and 9 months between first power and full service
The National Grid Corporation of the Philippines (NGCP) reports ₱10.2 billion for Hermosa-San Jose and ₱52 billion for the Mindanao-Visayas link.
Hermosa-San Jose reached full service after 13 months.
Mindanao-Visayas reached full service after 9 months.
The Bases Conversion and Development Authority (BCDA) targets the ₱6.95 billion Pax Silica substation for 2028.

The comparison describes completed projects. It does not predict the Pax Silica substation schedule.

Sources. Hermosa-San Jose · Mindanao-Visayas

The cost-stack sensitivity moves its marginal-cost result from ₱6.00 to ₱12.00 per kWh

The calculation removes transmission delivery as a constraint and adds the full 3,000 MW to Luzon. It estimates one modeled day under stated assumptions.

A flat-block cost calculation for Luzon
The stated cost-stack assumptions move the modeled result from coal to oil
The base cost-stack case averages ₱6.00 per kWh. Here kWh means kilowatt-hour. The added-demand sensitivity averages ₱12.00. Oil is the last block dispatched in 16 of those hours. The calculation leaves 664 MW of the supply stack unused. MW means megawatts.

The Visayas modeled peak rises to ₱11.98. Modeled link congestion rent is about ₱38 million in this one day. This is a cost-stack sensitivity, not a market-price or retail-bill forecast.

Resolution No. 10, Series of 2026 supplies the ₱6.00 value. The model labels the ₱12.00 oil value as an assumption. The nodal record shows congestion on 28 of 70 sampled days. Its nonzero median is ₱0.56 per kWh and its highest sampled value is ₱19.28 on 26 May 2026.

Sources. Coal price rule · Nodal prices

An illustrative 600 MW outage leaves 331 MW unmet in the chosen local-power case

BCDA plans local power but has not published a station size. This example uses a 2,500 MW station and a 600 MW unit.

Illustrative local station with grid backup
A chosen 2,500 MW station and 600 MW unit produce a 331 MW gap in this illustration
Both bars total 3,000 megawatts (MW). With the 600 MW unit unavailable, local supply and the 769 MW route leave 331 MW unmet.

The 331 MW gap follows from the chosen unit size. A 417 MW outage leaves 148 MW unmet. The archive covers 117 archived days.

The outage record lists San Gabriel out on 33 archived days and Masinloc Unit 2 out on 9 archived days. The files cover maintenance and unplanned outages together.

Sources. Outage schedules · Sual units

Pax Silica's water figure exceeds Makati household planning demand

BCDA states 65 to 90 million liters a day. The comparison uses a household planning value and does not replace a local water study.

Announced daily water demand compared with public planning figures
Pax Silica's stated water demand is 1.4 to 1.9 times Makati's household planning benchmark
The Makati calculation uses 309,770 residents and 150 liters per resident. It equals planning demand for 433,000 to 600,000 people. It excludes offices and industry.
Pax Silica water demand
Proposed harvesting facility
Comparison with the Angat allocation

The range equals irrigation for 500 to 690 hectares at 1.5 liters per second per hectare. It equals 1.6 to 2.3 percent of the Angat allocation. For scale, an Olympic pool holds 2.5 million liters. Pax Silica would use local water from the Sacobia watershed.

The National Water Resources Board says local sources are enough. The Bases Conversion and Development Authority (BCDA) supplied the project figure. Community and environmental groups dispute the water board's claim.

Sources. BCDA water figure · Irrigation basis

The 1,620-hectare project area equals 17.1% of New Clark City

The public record gives an area and competing accounts of land use. It gives no tree inventory for Pax Silica.

Announced project area compared with familiar places
The site is 1,620 hectares, about nine tenths of Makati's land area
Each square equals 50 hectares. Pax Silica covers 17.1 percent of the city by area, or 32 of the 189 squares shown for New Clark City.

No public tree inventory was found for Pax Silica. The Bases Conversion and Development Authority (BCDA) issued the compliance certificate for the project masterplan. Each company locating inside Pax Silica must still get its own.

BCDA reports about 10 farmers directly affected. Its affected-person list names O'Donnell, Aranguren, and Santa Lucia. Advocacy reporting cites 20,000 Indigenous people and 15,000 farmers for wider New Clark City. These counts cannot be subtracted. Public records say over 30 percent of Capas is productive farmland. BCDA projects 130,000 to 190,000 direct jobs.

Sources. BCDA area · Land concerns

Public links let readers check every input

Limits. The 769 MW route value uses a class line rating. The model connects Pax Silica to a mapped bus 8.6 km away. Demand stays flat, and the solar profile assumes a cloudless day. Announced figures may change. None of these comparisons values Pax Silica's benefits.

Community-mapped routes use OpenStreetMap data under the Open Database Licence. They are not NGCP geometry. Calculated values come from data/perspective.json.