Pax Silica in New Clark City, Capas, Tarlac
Pax Silica needs 3,000 MW and 65 to 90 million liters of water daily
The Bases Conversion and Development Authority announced both full-development figures in July 2026. Construction starts in 2028, with full development 10 to 15 years later.
The charts compare those figures with public market, grid, water, and land records. They label every calculation and assumption.
Pax Silica's 3,000 MW exceeds the highest recorded Visayas demand
The comparison uses 117 archived days. Luzon peaked at 14,232 MW. Visayas peaked at 2,744 MW and Mindanao at 2,748 MW.
Visayas forecasts around the same period ranged from 2,384 to 2,482 MW against 2,581 to 2,587 MW available. These are day-ahead values.
The market operator supplies the grid records. The Bases Conversion and Development Authority supplies the 3,000 MW figure.
Sources. Market records · BCDA figure
A 500 MW solar component produces 4.1% of one Pax Silica day in the cloudless-day model
ACWA Power leased 500 hectares for a project announced as solar plus battery storage. The chart models only the stated 500 MW solar component because no battery power or energy rating was published.
The lease is a public announcement. The hourly solar shape is a project assumption.
Sources. ACWA lease · Pax Silica demand
Solar alone would need 12,200 MW of panels. At the stated land density, that equals 122 square kilometers.
The calculation uses MTerra Solar's stated megawatt and hectare figures. OpenStreetMap contributors and CARTO supply the basemap.
Sources. MTerra Solar figures · Map data
Public route geometry does not establish how much Pax Silica can connect
The illustration below applies an assumed 400 MW class rating to each mapped 230 kV circuit and subtracts modeled flow for one hour. NGCP does not publish the circuit ratings needed to turn this into an interconnection result.
The National Grid Corporation of the Philippines (NGCP) supplies project records. OpenStreetMap supplies route geometry.
Sources. Demand record · Route map
The comparison describes completed projects. It does not predict the Pax Silica substation schedule.
Sources. Hermosa-San Jose · Mindanao-Visayas
The cost-stack sensitivity moves its marginal-cost result from ₱6.00 to ₱12.00 per kWh
The calculation removes transmission delivery as a constraint and adds the full 3,000 MW to Luzon. It estimates one modeled day under stated assumptions.
The Visayas modeled peak rises to ₱11.98. Modeled link congestion rent is about ₱38 million in this one day. This is a cost-stack sensitivity, not a market-price or retail-bill forecast.
Resolution No. 10, Series of 2026 supplies the ₱6.00 value. The model labels the ₱12.00 oil value as an assumption. The nodal record shows congestion on 28 of 70 sampled days. Its nonzero median is ₱0.56 per kWh and its highest sampled value is ₱19.28 on 26 May 2026.
Sources. Coal price rule · Nodal prices
An illustrative 600 MW outage leaves 331 MW unmet in the chosen local-power case
BCDA plans local power but has not published a station size. This example uses a 2,500 MW station and a 600 MW unit.
The 331 MW gap follows from the chosen unit size. A 417 MW outage leaves 148 MW unmet. The archive covers 117 archived days.
The outage record lists San Gabriel out on 33 archived days and Masinloc Unit 2 out on 9 archived days. The files cover maintenance and unplanned outages together.
Sources. Outage schedules · Sual units
Pax Silica's water figure exceeds Makati household planning demand
BCDA states 65 to 90 million liters a day. The comparison uses a household planning value and does not replace a local water study.
The range equals irrigation for 500 to 690 hectares at 1.5 liters per second per hectare. It equals 1.6 to 2.3 percent of the Angat allocation. For scale, an Olympic pool holds 2.5 million liters. Pax Silica would use local water from the Sacobia watershed.
The National Water Resources Board says local sources are enough. The Bases Conversion and Development Authority (BCDA) supplied the project figure. Community and environmental groups dispute the water board's claim.
Sources. BCDA water figure · Irrigation basis
The 1,620-hectare project area equals 17.1% of New Clark City
The public record gives an area and competing accounts of land use. It gives no tree inventory for Pax Silica.
No public tree inventory was found for Pax Silica. The Bases Conversion and Development Authority (BCDA) issued the compliance certificate for the project masterplan. Each company locating inside Pax Silica must still get its own.
BCDA reports about 10 farmers directly affected. Its affected-person list names O'Donnell, Aranguren, and Santa Lucia. Advocacy reporting cites 20,000 Indigenous people and 15,000 farmers for wider New Clark City. These counts cannot be subtracted. Public records say over 30 percent of Capas is productive farmland. BCDA projects 130,000 to 190,000 direct jobs.
Sources. BCDA area · Land concerns
Public links let readers check every input
- Earlier demand report and environmental review
- Water board statement and harvesting proposal
- Meralco example bill and household water basis
- Luzon population, Visayas population, and Mindanao population
- Makati area, BGC area, and New Clark City area
- MTerra project and MTerra report
- Substation report and Pax Silica explainer
- Displacement report and Water explainer
- 15 June alert and 16 June alert
- Gas price record and Administered prices
- Mindanao-Visayas service date and Hermosa-San Jose cost
- Angat allocation and Paddy-water basis
- Dispatch calculation and Fuel inputs
- Network calculation and Hourly profiles
- Archived market files and Final node prices
Community-mapped routes use OpenStreetMap data under the Open Database Licence. They are not NGCP geometry. Calculated values come from data/perspective.json.