Power Dispatch Studio

Market record

Philippine WESM market replay and scenario analysis

Loading the archive.

Details

Case study, one announced 3,000 MW campus → The announced load exceeds Visayas grid demand. Nine sourced charts compare it with power, transmission, land, and water records.
Jump to
Archive window loading. Transmission and grid lines follow real routes as mapped in OpenStreetMap. Data-center pins are city-precision.
Statistical indicators from public records (IEMOP, NGCP, Meralco, PCIJ, company filings). Patterns may have legitimate explanations. Forecasts are labeled with their owner. Methods, sources, and assumptions. Scope for production-cost analysts.

Archive findings

Visible map items